Prefab mobile homes
Updated on 10 October 2026 · Data from public sources, each with its link · How we work
Mobile houses and mobile homes: transportable prefab homes, designed to move from plot to plot without building work.
Models of prefab mobile homes
60 results
Delivered assembledGrupo Eurocasa
Nidify Suit mobile home studio
Delivers throughout Spain
Delivered assembledSORT-7
CCR28 prefab timber mobile home, 2 bedrooms
Delivers throughout Spain
Render 3DDelivered assembledAlucasa
Arizona model mobile prefab home, 85 m²
Delivers throughout Spain
Delivered assembledMiñarro y García
Alicante 52.5 m² wooden prefab house
Delivers to mainland Spain
Delivered assembledGrupo Eurocasa
Nidify auxiliary module: kitchen and bathroom in 10.6 m²
Delivers throughout Spain
Render 3DDelivered assembledAlucasa
Nevada model mobile prefab home, 65 m²
Delivers throughout Spain
Delivered assembledSORT-7
Málaga model cube-shaped prefab house, 3 bedrooms
Delivers throughout Spain
Delivered assembledMiñarro y García
L-shaped prefab house Murcia L 43.20 m²
Delivers to mainland Spain
Delivered assembledGrupo Eurocasa
Nidify Santorini 863 / MA mobile home
Delivers throughout Spain
Render 3DDelivered assembledAlucasa
Camelot model mobile prefab home, 70 m²
Delivers throughout Spain
Delivered assembledSORT-7
Moncada model prefab timber house
Delivers throughout Spain
Delivered assembledMiñarro y García
Alicante model prefab timber house, 49 m²
Delivers to mainland Spain
Render 3DDelivered assembledAlucasa
Calpe 3-bedroom prefab mobile home
Delivers throughout Spain
Delivered assembledGrupo Eurocasa
Nidify Bora Bora Sunset 863 / BU mobile home
Delivers throughout Spain
Delivered assembledTu Casa Móvil Tenerife
Frente Panorámico mobile home with gable roof
Delivers to 1 province
Delivered assembledRoyal Nature Homes
Seattle prefab mobile home, 1 bedroom
Render 3DDelivered assembledAlucasa
Indiana prefab mobile home with 3 bedrooms and 2 bathrooms
Delivers throughout Spain
Delivered assembledCasaMóvilSur
IRM Riviera Suite 2-bedroom prefab mobile home
Delivers throughout Spain
Delivered assembledGrupo Eurocasa
Nidify Bora Bora 766 mobile home
Delivers throughout Spain
Delivered assembledLercasa
MiniClass MC20 prefab tiny home of 20 m²
Delivers to mainland Spain
Render 3DDelivered assembledAlucasa
Viena prefab mobile home with 3 bedrooms
Delivers throughout Spain
Delivered assembledCasaMóvilSur
Cascais mobile home, 2 bedrooms
Delivers throughout Spain
Render 3DCustom-builtWoodville
Mohma Standard prefab timber house, 52 m²
Delivers throughout Spain
Delivered assembledCasas Carbonell
Madrid modular home, 47 m²
Delivers throughout Spain
Prices of prefab mobile homes
Turnkey from €27,400
Without assembly from €15,900
median price, €38,000
Shell only from €20,120
What the price (without assembly) usually includes
- Insulation: almost always included
- Electrics and plumbing: included in 4 out of 5
- Interior finishes: included in 4 out of 5
- Transport to the plot: almost always charged separately
- Assembly and lifting: almost always charged separately
- Foundations: almost always charged separately
- Earthworks: almost always charged separately
- Licences and fees: almost always charged separately
- Design and site supervision: almost always charged separately
- Utility connections (electricity, water, sewerage): almost always charged separately
- VAT: charged separately in 4 out of 5
Each manufacturer decides what goes into its price, so ask for the breakdown in writing before comparing two figures.
What to sort out beforehand
Frequently asked questions
What sizes do prefab mobile homes come in?
From 10 m² to 90 m², and the median size is 38 m² (60 models from 11 manufacturers).
Which manufacturers make prefab mobile homes?
Among others, SORT-7, Alucasa, CasaMóvilSur, Grupo Eurocasa, Woodville and Miñarro y García.
How long does it take to have the house ready?
It depends on the type of house: for turnkey houses, the median lead time advertised is 5 months (152 models from 25 manufacturers); for a kit, 7 weeks (124 models from 11 manufacturers). Each manufacturer counts from a different moment (the order, the signing or the licence), and if the count starts with the licence already granted, you must add however long the town council takes.